Outdoors · Updated November 26, 2026
Templeton GuideTempleton Trails, Creeks, and Cycling
Templeton is framed by the Salinas River, Toad Creek, oak hills, and a network of rural roads. The most important official trail project on the books is a planned Class I path connecting Templeton to Atascadero along the river. Here is what is official today, what is still in design, and what buyers should know about creeks and country roads.
Photo: countryside in the Paso Robles, Templeton, and Atascadero region. Carol M. Highsmith, public domain, Library of Congress.
The Templeton to Atascadero connector is a planned project, not a finished path you can ride today. County Public Works currently expects design to be completed in 2028, depending on funding, with construction tentatively in 2029 after right-of-way or access easements are in place.
The short version
- San Luis Obispo County Public Works is planning a Class I multi-use trail between the northern edge of Atascadero at Ferrocarril Road and the intersection of Vineyard Drive and Main Street in Templeton.
- The planned route follows the western edge of the Salinas River, crosses the Union Pacific Railroad on a new bicycle and pedestrian bridge, and continues along Main Street toward Templeton Road. It is intended to give people a separated path so they do not have to use the shoulder of Highway 101, which the County says is now the only direct bicycle route between the two towns.
- Toad Creek is a named local waterway in the Templeton Community Plan, running near North Main Street. It is important for drainage and for building and septic setbacks. It is not presented here as a formal public trail.
- Rural roads such as Vineyard Drive, Rossi Road, and Bethel Road are part of everyday travel in and out of town. Shoulders can be narrow. Use official County bikeway information, and ride with care.
- In-town walking is centered on Main Street, Templeton Park, and the nearby school campuses. See the park and Main Street guide.
The Templeton to Atascadero connector
The official County project page describes a new Class I multi-use trail for bicyclists, pedestrians, and other non-motorized users. Class I, in California's bikeway system, means a path separated from motor vehicle traffic. The County's stated purpose is public safety: today, the only direct bicycle route between Atascadero and Templeton is the shoulder of US Highway 101.
As published by Public Works, the alignment begins at Ferrocarril Road at the north edge of Atascadero, follows the western edge of the Salinas River, crosses the Union Pacific tracks on a new bicycle and pedestrian bridge, and continues along Main Street to Templeton Road. Most of the project is in Supervisorial District 1, with the southern edge in District 5.
Schedule matters if you are buying with this trail in mind. The County says design is expected to be completed in 2028, pending project funding, and that the construction schedule will depend on acquiring the necessary right of way or access easements. Construction is tentatively anticipated in 2029. Those dates can move. Use the official project page for the current status, and do not treat a future path as a present amenity in a purchase decision.
San Luis Obispo County Parks has also posted planning material on a Templeton to Atascadero pathway, including an earlier constraints report. The live project description and schedule used in this guide come from the current Public Works project page.
The Salinas River and Toad Creek
The Salinas River is the eastern edge of town for many residents, and it is the corridor the future Class I trail is planned to follow. It is a living river and floodplain, not a city greenway with a continuous public path today. Access, vegetation, and flood hazard vary by parcel. Land along the river can be beautiful, and it can also carry flood-hazard combining designations, limited legal access, or agricultural uses. Confirm flood mapping and access for the specific property with the County.
Toad Creek is the named creek that runs through Templeton. The Templeton Community Plan discusses office and professional land along North Main Street as a strip between Toad Creek and Main Street, which is a reminder that the creek is part of the town's official planning geography, not a side note. For buyers, the practical issues are usually drainage, erosion, and required setbacks from the watercourse for buildings and septic systems, not a maintained creekside trail. See the land use guide for how County septic and creek rules can affect a lot.
The Community Plan points to the County Parks and Recreation Element for proposed equestrian and hiking trails, and to the County Bikeways Plan for the planned bikeway system. Those adopted plans are the official place to look for proposed routes. This guide does not sketch informal paths or roadside routes onto a map.
Rural roads and cycling
West and south of town, Vineyard Drive, Rossi Road, and Bethel Road connect neighborhoods, schools, and acreage. They are working County roads, not parkways. Visibility, speed, and shoulder width change from one stretch to the next. If cycling is part of how you want to live here, drive those roads at commuting hours before you buy, and look at current County Public Works and Bicycle Advisory Committee materials for any planned or recently built bikeway improvements, including work along the Vineyard Drive corridor.
Vineyard Elementary sits on Vineyard Drive, and a Trader Joe's is on Rossi Road, so these corridors are also school and errand routes, not only recreational ones. Until the river trail is built, there is no official separated path connecting Templeton to Atascadero. Plan accordingly.
Maps and official documents
Use official County project maps and adopted plans. This guide does not draw approximate trail or bikeway overlays.
- County Public Works, Templeton to Atascadero Connector Bicycle Trail
Official project description, schedule (design expected 2028, construction tentatively 2029), and location map.
- County Parks, Templeton to Atascadero Pathway planning page
Parks Department planning materials related to the pathway concept.
- Templeton Community Plan, Circulation Element
Official community-plan discussion of bikeways, trails, and the railroad corridor along Main Street.
- San Luis Obispo County Bikeways Plan
Adopted County bikeway planning document. Check Public Works for later updates and project status.
- County Bicycle Advisory Committee
Current agendas, minutes, and bikeway-related documents.
Please verify. Rules, maps, and program details change. This is general information, not legal, engineering, insurance, tax, or school-enrollment advice. Confirm the facts for a specific property or family with the official agency and your own advisors. A planned trail is not the same as a completed trail. Confirm current project status with County Public Works.
Sources (checked November 26, 2026)
- County of San Luis Obispo Department of Public Works, Templeton to Atascadero Connector Bicycle Trail project page and official location map
- San Luis Obispo County Parks, Templeton to Atascadero Pathway planning page
- Templeton Community Plan, Circulation Element (bikeways and trails)
- County Public Works Bicycle Advisory Committee document library
Want land by the river, or a house close to town roads you can walk and ride?
Mark can help you look at the property as it is today, including access, flood questions, and what is still only on a County project map.